Irishplanningnews.ie

Keeping up to date with planning in Ireland

Copyright

Use of content from this website for newspaper articles, blogs etc is permitted, subject to irishplanningnews.ie being quoted as the source.
Please feel free to volunteer any planning information for the website such as information about new plans etc. Email david@planningconsultant.ie
Notice: While every effort is made to verify the content of this site, the site owners cannot accept responsibility for the information contained.
  • An Bord Pleanala have refused permission for 11 no. turbines in Ardglass, East Cork, by Order dated 2nd December 2014. The turbines would have measured 156m (the Spire in Dublin is approx. 120m). A number of sources have quoted these turbines as being the tallest on-shore turbines proposed in Ireland.

    The Board refused permission having regard to:
    (a) the Cork County Development Plan 2009- 2015,
    (b) the Wind Energy Guidelines 2006,
    (c) the number, scale and height of the proposed turbines,
    (d) the location of the site in a quiet rural elevated upland plateau, and
    (e) the lack of significant landscape features in the area,
    stating that they were not satisfied that on the basis of the documentation submitted that the proposed development, by reason of the open and exposed nature of the receiving landscape, and by reason of proximity to noise sensitive receptors, would not result in serious injury to the visual and residential amenities of the area.

    The Board was also not satisfied that the planning application would not have a significant adverse impact on the ecology of the area, including protected species, and that insufficient information was contained within the file to allow it to conduct a screening for Appropriate Assessment.

    Finally, the Board also considered that Read the rest of this entry »

    Published on December 9, 2014 By:David Mulcahy · Filed under: Green Energy, Important An Bord Pleanala Decisions; Tagged as: , ,
    No Comments
  • An Bord Pleanala have granted planning permission to Coillte Teoranta for an 18 turbine windfarm near Ballyroan village in County Laois, despite significant local objections, the Council refusing permission, the Board’s inspector recommending refusal and concerns raised by the Department of Arts, Heritage and the Gaeltacht regarding protected species.

    Laois County Council had refused permission on the basis of the inadequacy of information received in the EIS and the potential impact on Natura 200 sites.

    The An Bord Pleanala Inspector recommended refusal on the basis of visual impact arising from excessive quantity and overall height of the turbines, the overbearing impact on the residents of in the vicinity and the absence of detailed information showing haul routes.

    The Board however granted permission noting Read the rest of this entry »

    Published on June 19, 2014 By:David Mulcahy · Filed under: Green Energy, Important An Bord Pleanala Decisions; Tagged as: , , ,
    No Comments